Fusion21 announces £300m maintenance work

Fusion21 announces £300m maintenance work

Fusion21 has announced the contractors and suppliers appointed to its national planned maintenance framework – offering a combined worth of up to £300 million over a four year period.

A total of 50 contractors have successfully secured a place on the Installation Works framework, worth up to £200 million over a four year period – whilst 47 material suppliers have been appointed to the Supply of Materials framework, worth up to £100 million over a four year period.

The Installation Works framework has four lots including: kitchen replacements; bathroom replacements; windows and doors and communal door installations – whilst the Supply of Materials framework covers 18 lots, and offers a variety of materials required for use in kitchen and bathrooms, heating, and windows and doors programmes.

Specific lots on the Supply of Materials framework range from kitchen units; to flooring and electric showers; in addition to smart heating systems; tiles; water treatment and communal entrance doors.

Nick Verburg, Procurement Manager at Fusion21, said: “Achieving a place on these frameworks is significant, as they will not be renewed until 2020.

For the first time, these frameworks offered installation elements split over two value bands – and as a result, we are delighted to see a number of small and medium sized enterprises appointed to the frameworks, and eligible to win work.”

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>