The Thames Tideway Tunnel project has selected its preferred construction to drive three major tunnel sections of the London Super Sewer that will create thousands of jobs.
The project, which will be the biggest infrastructure project ever under taken by the UK water industry, will make London’s sewerage network fit for the 22nd century and will help prevent the millions of tonnes of sewage pollution that currently discharge into the tidal River Thames every year.
Andy Mitchell, Chief Executive at Thames Tideway Tunnel, said: “We have selected our preferred bidders to work on the three main works packages because we have absolute faith in their ability to carry out these major pieces of work safely, considerately and sustainably and we are looking forward to working with them to offer the thousands of jobs that will help make this project a reality.”
The Thames Tideway Tunnel project will create more than 4,000 direct sustainable jobs, and another 5,000 jobs indirectly.
It will be offering hundreds of apprenticeships and work placements, is committed to employing local people, and will be creating a never-before seen surge in the river economy through marine employment opportunities.
The contractors which have been chosen as the preferred main works tenderers are: BMB JV (Joint Venture of BAM Nuttall Ltd, Morgan Sindall Plc and Balfour Beatty Group Limited) for the West contract, FLO JV (Joint Venture of Ferrovial Agroman UK Ltd, Laing O’Rourke Construction) for the Central contract and CVB JV (Joint Venture of Costain Vinci Construction Grands Projects Bachy Soletanche) for the East contract.
